Objective: to conduct a comparative assessment of the effectiveness of rock riprap and pile foundations for ensuring subgrade stability in permafrost areas of Amur Oblast. Methods: assessment of embankment slope stability using the Shakhunyants method (circular cylindrical slip surfaces) in the GEO5 software. Calculations were performed for two reinforcement options: rock riprap and pile field (length 5 m, spacing 2.5 m). Results: the factor of safety for rock riprap was 2.53, and for the pile field — 2.41. Both values exceed regulatory requirements (1.15–1.30). The seasonal freezing depth in the region reaches 2.0–2.5 m. Practical significance: the results can be applied in the design of roads on sections of the Baikal- Amur Mainline. The choice of solution is recommended to be determined by technical and economic comparison considering local conditions.
No takes yet. Share an insight, caveat, or question.
Kolos et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: