Answers are grounded in this paper and cite their sources.
This study considered the complex offshore construction environment of the mass marine concrete pouring processes for the main tower cap of the sea-crossing cable-stayed bridge in the DSSJ03 bid section of the Ningbo Zhoushan Port. A MIDAS/Civil finite element software method was used to analyze the temperature field of the mass marine concrete of the No. ZT4 main tower cap, for the purpose of simulating and optimizing the flow velocity and inlet water temperatures of the cooling water pipes, as well as to optimize the original pipe cooling scheme. It was found that when compared with the actual monitoring temperature data of the hydration heat during the construction process, the cooling rate of the optimized pipe cooling scheme had been controlled within 2℃/d, with a high stress safety factor. This had effectively reduced the impacts of temperature stress of the marine concrete of the main tower cap. In addition, the generation of cracks in the mass marine concrete sections located in the harsh offshore environment was decreased, and the construction quality of the marine concrete poured into the complex offshore environment had been improved.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: