Answers are grounded in this paper and cite their sources.
The concept of capability chart, traditionally related to the synchronous machines, has been extended to the whole generator-transformer unit, and has proven to be an effective tool in planning and design activities: different solutions can be compared in terms of active and reactive powers injected by the generating unit into the high-voltage busbar. The operation of the unit in points belonging to the capability chart requires to suitably choose the set-points of the unit controls: a control law is proposed which requires minimum changes to the usual control structures, and does not need new measurements. Numerous tests on a typical generating unit highlight the effectiveness of the capability chart as a planning tool, and the features of the proposed control law.
No takes yet. Share an insight, caveat, or question.
Losi et al. (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: