Answers are grounded in this paper and cite their sources.
Continuous electrical data can support both monitoring and short-term forecasting in distributed infrastructures. This study presents an end-to-end framework for non-invasive current monitoring and forecasting of the platform-derived aggregate load of wastewater pumping stations. The deployed architecture combines SCT current sensors, Arduino Uno acquisition, a custom EasyEDA-designed electronic interface, Raspberry Pi-based storage and communication, and remote data aggregation. Fourteen stations comprising 23 three-phase pumps are covered by 69 sensing channels. The available dataset comprises 720 consecutive hourly observations. A rolling-origin protocol uses 18 days for initial fitting, five daily origins for hyperparameter selection, and seven held-out daily origins for testing, yielding 168 out-of-sample predictions. A seasonal-naïve benchmark was compared with a linear autoregressive model, a multilayer perceptron (MLP), and an RBF–GRNN. None of the three fitted models showed a statistically conclusive reduction in MAE relative to the seasonal-naïve benchmark, because all paired block-bootstrap 95% confidence intervals for the MAE differences included zero. Descriptively, among the four prespecified models, the MLP achieved the lowest MAE (0.441 kW) and MAPE (3.266%), whereas the RBF–GRNN achieved the lowest RMSE (0.525 kW) and the highest R2 (0.918). An exploratory post hoc LSTM analysis yielded an MAE of 0.424 kW but a higher RMSE (0.637 kW) and maximum error (2.959 kW); it likewise did not demonstrate a statistically conclusive advantage over either the MLP or the seasonal-naïve benchmark. The results demonstrate a modular sensing-to-forecasting workflow while showing that the observed differences among models require validation over longer monitoring periods.
No takes yet. Share an insight, caveat, or question.
Filippo Laganà (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: