With the increasing renewable penetration in electrical grids, high power ramp rates can lead to grid instability. Power ramp-rate control (PRRC) requirements are being implemented in an increasing number of countries, with penalties for non-compliance. While curtailment and power reservation enable ramp-rate control without energy storage, they inherently decrease the grid-injected energy and generation revenue. Battery storage avoids these drawbacks while reducing violations, and can also be used for arbitrage to increase profitability. This study proposes a simulation-based optimization framework to maximize the net present value (NPV) of battery storage integrated into PV, wind, and hybrid PV–wind systems under two distinct penalty schemes. A battery-based PRRC is compared with curtailment and power reserve strategies, revealing that battery storage yields the highest NPV and the fewest ramp-rate violations. Using Spain’s 2025 hourly electricity market prices and current utility-scale battery costs, the system with an LTO (high C-rate) battery-based PRRC under a 10%/min ramp-rate limit achieves an NPV comparable to the unconstrained case. Battery arbitrage under these conditions is not worthwhile, as the NPV improvement is negligible. Under a hypothetical stretched price scenario (average price: 102.9 EUR/MWh; average daily spread: 232.1 EUR/MWh), energy arbitrage using an LFP battery (low C-rate) becomes highly profitable. Relative to the unconstrained baseline, this strategy yields net present value (NPV) improvements of 17% for the wind system and 28% for the hybrid PV–wind system. Furthermore, the NPV for the PV system shifts from −2 million EUR to 6 million EUR, demonstrating that arbitrage viability depends heavily on market price volatility.
No takes yet. Share an insight, caveat, or question.
Dufo‐López et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: