Large-scale autonomous systems — networks that combine first-of-a-kind (FOAK) technology, heavy civil and energy infrastructure, and a novel software-and-sensing autonomy stack — are among the most difficult programmes to cost, schedule, and de-risk before commitment. The empirical record for megaprojects is unforgiving: cost overruns and schedule slippage are the norm, driven by optimism bias, immature technology, correlated risks, and long-lead supply constraints. This paper sets out an integrated, reproducible pre-commitment modelling methodology with five components: (1) a work-breakdown-structure (WBS)-driven capital-expenditure (CapEx) estimate carrying explicit uncertainty ranges and learning-curve effects for mass-produced elements; (2) critical-path scheduling under deep uncertainty using an event-sourced engine, Helm, that computes a working-calendar critical path, resource capacity, and Monte Carlo finish-date distributions and re-plans deterministically from a logged event stream; (3) feasibility gates — technology-readiness, supply-chain, power/energy budget, and integration risk — each with explicit go/no-go criteria; (4) a procurement layer covering make-versus-buy, single-source versus competitive tendering, and long-lead item management; and (5) an integrated feasibility index that triangulates bottom-up estimates against reference-class benchmarks. A fully de-identified worked illustration on a generic autonomous-freight network demonstrates the method end to end. The approach is technology-neutral and applies to any multi-billion-unit-of-currency autonomous or infrastructure programme. Preprint; not yet peer reviewed.
No takes yet. Share an insight, caveat, or question.
Christopher I. V. Farmer (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: