Multi-inverter photovoltaic plants connected to weak grids can satisfy point-of-common-coupling requirements while individual converters approach internal limits. This paper develops a critical-mode-aware two-stage safety projection for constraint-aware operation. A two-port sequence model and a critical-frequency-band (CFB) criterion locate the interaction band in which the return-difference margin is most sensitive to active-power commands. The first stage computes the curtailment required to satisfy predicted current-reference, modulation, and dc-link constraints. The second stage uses any remaining dispatch freedom to improve the return-difference margin with minimum weighted curtailment. A 40-case calibration selects a 0.05 contraction of the normalized device-risk target; an independent 60-case test with parameter variations of up to ±20% produces no post-20 ms current-reference violations. In five OP5700 real-time model-execution cases, three meet the strict unit current-reference limit, while two finish slightly above it at 1.03 and 1.04. The isolated MATLAB/Simulink R2024b projection kernel has mean, 99th-percentile, and maximum execution times of 4.57, 7.20, and 213.4 microseconds over 20,000 calls. Nine-inverter nonlinear studies, a three-inverter PSCAD V5.0 switching simulation, and OP5700 real-time model execution support constraint recovery over the tested operating set, but not universal strict feasibility.
No takes yet. Share an insight, caveat, or question.
Lin et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: