Answers are grounded in this paper and cite their sources.
BC Hydro has completed construction of the Site C Clean Energy Project, which is the third hydroelectric dam on the Peace River in northeastern British Columbia, Canada. We implemented a staged approach to upstream fish passage at Site C, whereby a temporary upstream fish passage facility was operated during the river diversion phase of construction (2020 to 2024). Following the closure of the diversion tunnels and reservoir filling in the fall of 2024, we began operating the permanent upstream fish passage facility at the outlet of the generating station to provide for upstream fish passage during the operations phase of Site C. Here we share key lessons learned from 15 years of planning, design, construction, and operation of the temporary and permanent facilities, which represented a unique effort involving a new and large hydroelectric development and construction sequencing approach. Importantly, the surprises and mistakes we encountered – no matter the scale or implication – reinforced the unique opportunity to learn from the temporary facility and apply those learnings to the design, construction, and operation of the permanent facility. Our lessons learned span a wide range of topics and disciplines – collaborating with experts, engaging external parties, location of the fishway entrance, designing for operational flexibility, operator safety, team structure, and effectiveness monitoring, coordinating construction tolerances, knowledge transfer and continuity of resources, and the behavioural response of fish – and should prove useful to practitioners, natural resource managers, biologists, and engineers involved in new or existing fish passage projects elsewhere.
No takes yet. Share an insight, caveat, or question.
Burnett et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: