Answers are grounded in this paper and cite their sources.
Distributed hybrid flow shop scheduling is prevalent in industries such as integrated circuit manufacturing, ceramic frit production, glass fiber processing, and steelmaking. Machine breakdowns and deteriorating jobs represent common and disruptive sources of uncertainty in these distributed manufacturing environments. However, existing research has often overlooked these significant challenges. To address this gap, this article addresses the dynamic distributed hybrid flow shop scheduling problem with machine breakdowns and deteriorating jobs (DHFSP-MBDJs), and develops the mathematical model. We propose a learning-assisted genetic programming hyperheuristic (L-GP-HH) algorithm to minimize makespan. L-GP-HH incorporates a novel constructive heuristic for factory assignment and develops specific terminal sets based on fundamental factors and uncertain events to generate genetic programming (GP) heuristics. Additionally, we establish a learning probability model to optimize the selection of GP-generated rules during the solution process. Extensive numerical experiments demonstrate that L-GP-HH consistently outperforms conventional GP hyperheuristics (GP-HHs), benchmark scheduling rules, and four efficient meta-and hyperheuristics. It exhibits superior flexibility and adaptability in handling complex scheduling under dynamic environment with uncertainties. This study provides critical insights for practitioners, emphasizing the necessity of concurrently considering machine-and job-related uncertainties in dynamic distributed manufacturing systems to enhance scheduling robustness and operational efficiency.
No takes yet. Share an insight, caveat, or question.
Luo et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: