Compound disruptions in high-end equipment manufacturing can simultaneously fragment operations and maintenance (O&M) resource networks and constrain critical resource flows. Using natural disasters and trade sanctions as representative compound risks of topology-based network fragmentation and capacity-constrained flow bottlenecks, this study addresses a recovery problem in which network reconfiguration changes the feasible space of downstream resource scheduling, while scheduling outcomes feed back through system-level evaluation to influence upstream reconfiguration. The problem is further complicated when multiple projects compete for heterogeneous, category-specific resources under contractually binding delivery requirements. An integrated recovery model based on a dual-layer business–resource network is developed to coordinate network reconfiguration and resource scheduling while balancing recovery cost, duration, and pending repair rate. To solve the coupled problem, a dual-agent algorithm based on hierarchical multi-agent proximal policy optimization (HMA-PPO) is proposed. Its main architectural feature is a hierarchical conditional coordination mechanism: the reconfigured network is transmitted forward to construct the state and feasible decision conditions of downstream resource scheduling, while the network-reconfiguration and resource-scheduling decisions are jointly evaluated as an integrated recovery solution, with the resulting system-level evaluation shared by both agents for policy updating. Numerical experiments show that HMA-PPO achieves the lowest mean objective value among the tested baselines, reaches the exact optimum on all three tested small instances, and requires approximately 0.24 s for post-training online decision making. Its relative solution-quality advantage becomes more evident as the tested decision space expands; on the large network, the mean objective value is 12.84% lower than that of Multi-Agent Proximal Policy Optimization (MAPPO) and 7.21% lower than that of Adaptive Large Neighborhood Search (ALNS). Scenario analyses further show that compound risks increase total O&M cost by 25.17% on average relative to the single natural-disaster scenario, while backup-supplier configuration and operating margins materially affect recovery resilience. These findings provide a unified perspective on coupled structural recovery and constrained resource allocation for resilience management in advanced manufacturing systems and operations research. Enterprises should diversify backup-supplier portfolios while jointly assessing supplier quality, usable capacity, transportation conditions, and delivery reliability rather than relying on supplier count alone. They should also use stress testing to identify scenario-specific operating buffers and prioritize scarce resources according to project urgency, resource criticality, and contractual delivery requirements.
No takes yet. Share an insight, caveat, or question.
Wei et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: