Answers are grounded in this paper and cite their sources.
The Kiev's research reactor WWR-M has been in operation for more than 50 years. Decommissioning plan should to be prepared and approved before the beginning of the decommissioning activities. A key activity during reactor operation is implementing the pre-decommissioning complex engineering and radiation inspection. It should be done with objective to collect, arrange and analyze the data related to the engineering and radiation conditions of the reactor systems and equipment. Recently, such an inspection has been completed. The analysis of available documentation has consisted in the assessment of design, construction, technological, assembling, operation, maintenance and repair documentation for each system. The radiation survey was performed in two different ways, namely, by doing the experimental measurements and by performing calculations. The collected data are provided a comprehensive technical basis for the development of decommissioning documentation which is required for the planning and implementation of the reactor decommissioning.
No takes yet. Share an insight, caveat, or question.
Lobach et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: