Purpose In the electronic manufacturing services industry, frequent changeovers in high-mix, low-volume production significantly affect overall equipment effectiveness. Reducing these nonvalue-added activities is therefore essential for improving operational performance and competitiveness. This study aims to reduce changeover durations in a surface-mount technology (SMT) workshop through the structured application of the single minute exchange of die (SMED) methodology, combined with digital monitoring tools. Design/methodology/approach The proposed approach consists of three phases: an initial diagnostic based on time analysis and root-cause identification using Ishikawa diagrams, implementation of SMED through task separation, externalization, parallelization and standardization and performance monitoring using a real-time Power BI dashboard. Findings The results show reduction in average changeover time from 48 min to 18 min in week, corresponding to a 62.5% improvement. This reduction generates annual savings exceeding €600,000 while improving process reliability, traceability and working conditions. Originality/value Rather than proposing a new SMED technique or a new digital platform, this study contributes an integrated Digital SMED framework specifically adapted to high-mix SMT production. The framework links SMED task transformation with intelligent operator-support tools, standardized preparation, real-time performance monitoring and data-driven corrective actions. The study further provides empirical evidence of the mechanisms associated with changeover reduction and demonstrates how digital feedback can support the stabilization and sustainability of SMED improvements.
No takes yet. Share an insight, caveat, or question.
Taboubi et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: