Answers are grounded in this paper and cite their sources.
Takeaway Detail Require peak headway ≤15 minutes for station-area upzoning The 2026 three-metro screen sets a ≤15-minute peak headway gate; avoid weaker proxies Independent technical note mirroring the canonical version: https://urbanplanadvisor.com/blog/upzoning-near-transit-a-2026-three-metro-vmt-screen-for-build-or-wait.php
No takes yet. Share an insight, caveat, or question.
Hadley Sims (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: