Answers are grounded in this paper and cite their sources.
This screening-level assessment tests whether small wind belongs in a least-cost hybrid plant for a critical-facility bus at Kaduna State University (10.52° N, 7.44° E), and whether that answer depends on wind-measurement height and a limit on photovoltaic capacity. An open hourly load-following model used NASA POWER (2026) meteorology for 2022 and a synthesised critical load (peak 97.1 kW; 477 MWh yr−1). A generic turbine curve gave capacity factors of 4.8% at 10 m (mean 3.41 m s−1) and 19.2% at 50 m (mean 5.34 m s−1). Among 1,350 candidate grid combinations retained only if the loss-of-power-supply probability was at most 1%, the unconstrained cost minimum under the assumed prices was 320 kW of photovoltaics, 800 kWh of storage and 40 kW of diesel, with no wind: levelised cost 0.190 USD kWh−1, renewable fraction 91.4%, and diesel CO2 40 t yr−1, against 0.351 USD kWh−1 and 505 t yr−1 for diesel only. Capping photovoltaics at 200 kW brought 40 kW of wind into the optimum and raised the levelised cost to 0.215 USD kWh−1 within the explored design space. The wind-selection result is conditional on the synthetic load, screening costs and single-year resource series; a 10 m mean should not be used as hub-height input for this site.
No takes yet. Share an insight, caveat, or question.
Anthony et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: