Answers are grounded in this paper and cite their sources.
Neutral sections in 25 kV AC railways require trains to coast with the main circuit breaker open, which temporarily interrupts traction. Regenerative-energy use also varies with the power-receptive capacity of the feeding section and the upstream grid. The operational and energy effects of a bidirectional continuous feeding system based on a modular multilevel converter (MMC) were quantified using a one-dimensional train-motion model and an energy-balance calculation. A 300 km/h train was evaluated for effective de-energized lengths of 200–800 m and gradients of 0–15‰. At 400 m, speed loss increased from 1.28 km/h on level track to 3.23 km/h at 12‰ and reached 7.50 km/h at 800 m and 15‰. The calculated delay to initial-speed recovery remained below 0.4 s. When regenerative receptivity increased from 0.32 to 0.88, the reduction in normalized net supply energy ranged from 5.8% to 18.6% as the recoverable braking-energy ratio varied from 0.10 to 0.30. The reduction was 12.0% at a ratio of 0.20. Field validation requires synchronized measurements of train operation and feeder power to replace the assumed vehicle parameters and receptivities.
No takes yet. Share an insight, caveat, or question.
Kang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: