Answers are grounded in this paper and cite their sources.
The surface settlement (SS) caused by shield tunnel in the loess strata of the northwest region is significant during the construction and operation periods. Taking a metro section tunnel as an example, using the Fast Lagrangian Analysis of Continua in 3D(FLAC 3D ) software, the parameters n and α that affect the constitutive model of the soil layer were inversely analyzed. This study deeply explored the influence laws of various factors on surface settlement during the shield construction and operation periods, and conducted sensitivity analysis on these factors. The results show: (1) The modified Mohr–Coulomb model (MMC) better reflects the SS caused by shield tunneling. To reduce the impact of SS, it is recommended to control the soil chamber pressure ratio between 1.0 and 1.2, the grouting pressure ratio between 0.9 and 1.2, and the shield thrust ratio has little effect. This method not only meets the settlement requirements but also reduces economic losses and construction risks. (2) To ensure the long-term safety of the shield segments, the number of leakage blocks should not exceed 3. The groundwater recharge and elevation in the loess layer can help reduce SS, but it should be controlled within 3.0 m. It is recommended that the groundwater level should be controlled 2 m below the initial water level. (3) Through the sensitivity analysis of SS, the sensitivity of each influencing factor to SS from high to low is as follows: the number of leaking segments Q SS ( N ) > the falling height of groundwater level (FHGL) Q SS (△ h F ) > soil chamber pressure ratio Q SS ( λ ) > grouting pressure ratio Q SS ( δ ) > the rising height of groundwater level (RHGL) Q SS (△ h R ) > shield thrust ratio Q SS ( ψ ). In the later stage of construction, first focus on the waterproof measures of the lining segments, which is a key issue to be concerned about in the later stage. Secondly, the change of the groundwater level is controlled as much as possible to keep the groundwater level of the soil layer unchanged. During the construction period, the main control is the change of the grouting pressure. On the basis of the grouting pressure, the grouting pressure and the shield thrust should reach the soil pressure balance.
No takes yet. Share an insight, caveat, or question.
Wei et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: