A method for building line-item cost estimates for federal-aid highway projects from the bid tabulations state transportation agencies publish after each letting. It uses time-weighted median unit prices (180-day half-life) across all bidders, keeps data-driven pricing separate from estimator judgment, and adjusts for overlap between related project conditions. The document sets out the data foundation (New Hampshire DOT, Maine DOT and Vermont Agency of Transportation), the estimation pipeline and its limitations. It reports a head-to-head test against New Hampshire DOT’s published engineer’s estimates on eight completed projects, using the FHWA measure of estimates within ±10% of the low bid: the method fell within that range on eight of eight projects, the agency estimate on three. It also outlines how an agency estimating unit could adopt the method.
No takes yet. Share an insight, caveat, or question.
Olaniyi Oladepo (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: