Pile foundations are designed when the surface ground does not have sufficient bearing capacity or when the construction transmits large loads. The design begins with the geotechnical study, which establishes the characteristics of the terrain and the appropriate type of pile. The working platform for pile execution is prepared by cleaning and leveling the land, creating a stable surface for equipment, and ensuring water drainage. A technological platform is executed, as appropriate, from compacted granular materials capable of supporting loads during drilling or pile batteries. Before starting work, the correspondence between the layout, the project and the actual conditions on the ground is checked.