This is the authors' abstract. We don't add key points for this paper.
Decentralized solar mini-grids now sit at the center of efforts to close the world’s largest national electricity access deficit. Nigeria, where an estimated 87 million people lacked electricity in 2024, has used World Bank-financed programs to subsidize private mini-grid developers, largely through grants paid per verified connection. Such instruments are good at producing connections; whether they produce durable service is a separate question. This paper examines that question through a comparative field assessment of four solar hybrid mini-grids in Kwali Area Council, Federal Capital Territory, inspected by the author in July 2026. Three sites, delivered under the Nigeria Electrification Project’s performance-based grant window, were orderly and well kept four to five years after entering service. The fourth, an older installation whose origin and ownership could not be confirmed, had a reportedly failed inverter, burnt fuses, a cracked module, an apparently inactive distribution board, and reported early-evening shutdowns, and could be reached only along a severely eroded road. None of the four power rooms held single-line diagrams or as-built drawings. Drawing on literatures on infrastructure maintenance, energy justice, and service delivery in fragile settings, the paper argues that the durability of decentralized energy is a property of the maintenance regime around the hardware (information, people, parts, paths, and accountability) rather than of the hardware alone. It closes with recommendations for Nigeria’s Distributed Access through Renewable Energy Scale-up program and a research agenda on reliability, institutional trust, and peace.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Abraham Olajide Oni (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: