This paper presents a complete design study of a phase-transit cargo ferry rated for a payload of five tonnes, computed throughout from stated assumptions. A crossing specified at eight full turns of the phase coordinate costs 4800.0 MJ of electrical energy, drawn at a mean power of 1333.3 kW over a one-hour crossing. A single turn costs 600.0 MJ and a sixteen-turn route costs 9600.0 MJ. The conventional tug performing the same transfer would expend 713.2 kg of propellant carrying 3209.2 MJ of chemical energy, so the ferry replaces a propellant bill with a larger but reusable electrical bill. Every figure is a computed result of the stated model and nothing was built or tested: the study is SIMULATED, NOT MEASURED, and its limits are stated as plainly as its performance.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: