The prediction of the duration of a construction project is a highly complex task influenced by multiple factors. To tackle the heterogeneity and noise of historical datasets, this paper proposes the use of a highly controlled, simulation-generated dataset comprising 157 realistic schedules of school construction projects. The schedules were generated using six core planning variables. A distinctive contribution of this research is the systematic evaluation of the combinatorial performance between data normalization techniques (Min-Max and Z-score) and learning algorithms (Support Vector Regression and Artificial Neural Networks). The models were globally optimized using cross-validation to prevent data leakage. Comparison between the results of the SVR model with an RBF kernel under Min-Max normalization, and a compact ANN with one hidden layer using the Levenberg-Marquardt training function, demonstrated high theoretical accuracy within the simulated boundaries. The results indicate that SVR yields superior generalization accuracy across the analyzed scenarios. Furthermore, a conceptual reliability-aware framework, ScheduleRelia, is introduced. ScheduleRelia serves as a proof-of-concept application designed to estimate project duration and assess schedule health using critical path metrics. While broad generalization requires future external validation with real-world inputs, this study establishes a rigorous baseline for algorithm selection and data formatting in schedule forecasting.
No takes yet. Share an insight, caveat, or question.
Hassi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: