Answers are grounded in this paper and cite their sources.
Urban development in most cities have been associated with increased Construction and Demolition (C&D) waste generation. This study evaluates the extent of stakeholder engagement throughout the construction process in Abuja. Using a quantitative cross-sectional approach, 344 well-structured questionnaires were distributed to construction stakeholders. Responses received were 168 (48.8% response rate). Data was analysed using relative importance indices, mean and percentages. The study found that early engagement during planning and design was seen as most important (M=3.86). However, Building Material Recovery (BMR) planning on site was very weak. Off-site reuse/resale through informal secondary markets dominates material valorization (mean = 3.98), whereas formal contractual mandates for Circular Economy (CE) (mean = 2.90) and recycled procurement specifications (mean = 2.50) are severely lagging. The study concludes that current BMR practices in Abuja are largely reactive and informal-market-driven rather than proactivity-engineered. It recommends the institutionalization of regulatory frameworks, mandatory pre-demolition audits, and formal public-private partnerships (PPPs) for C&D waste processing infrastructure to enhance environmental performance outcomes.
No takes yet. Share an insight, caveat, or question.
Stanley et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: