Gas-insulated switchgear (GIS) protects itself against dielectric breakdown by tripping when the SF6 pressure falls below a fixed level. This logic cannot distinguish a slow leak from a rapid pressure loss, and a single threshold forces a compromise: set high, it de-energises the equipment unnecessarily during chronic leaks; set low, it cannot guaran-tee that the pressure remains above the critical level by the time the breaker completes its operation during a fast leak. This article proposes a trip rule in which the breaker operates once breach of critical level within the protection chain's reaction-time budget becomes near-certain under a conservative upper bound on the estimated leak rate. The method cou-ples choked-orifice leak physics with an interacting multiple-model estimator of pressure and leak conductance, operating on temperature-compensated measurements; the probabil-ity of first hitting the critical level within the reaction budget is available in closed form through the inverse-Gaussian first-passage distribution. The proposed method is compared with four threshold-crossing baselines in a five-way ablation study across leak severities. The same running estimator additionally supplies a short-term breach-risk probability and a long-term remaining-useful-life estimate with an 80% prediction interval. Of the five methods, only the proposed one keeps the pressure above the critical level at breaker com-pletion in every tested leak class while avoiding unnecessary tripping, and its remaining-time interval attains 80–100% empirical coverage of its nominal level. A first-hitting-time criterion thus provides uniformly safe operation and accurate prognostics from a single es-timator, where threshold-crossing rules must trade one against the other.
No takes yet. Share an insight, caveat, or question.
Mammadov et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: