Answers are grounded in this paper and cite their sources.
This study sizes sulfur-bound regolith concrete for a reference unpressurised shell of 18 cubic metres: the structure masses 36 tonnes, of which 12.6 tonnes is sulfur binder, and melting and placing the binder requires 3.02 gigajoules at the stated allowances, with no process water. Sizing follows from computed material and thermal budgets derived in the study. This is a computed study with no targeting or weapon application. The work is simulated and computed from stated assumptions, not measured.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: