Answers are grounded in this paper and cite their sources.
Workload flexibility and battery storage can support data-center energy management, but evaluating their operating value requires explicit checks of execution feasibility, numerical solution quality, and economic accounting. This study assesses these dimensions in a six-region benchmark with 50,000 tasks and 2407 hourly intervals. Event-time checks reveal resource violations hidden by hourly accounting; regional reassignment restores modeled feasibility but can worsen service and cost outcomes. Same-objective dispatch comparisons and numerical sensitivity analyses improve export revenue and grid-exchange smoothness relative to the historical low-carbon result, without further reducing already-zero purchased-grid emissions. Matched controls and conditional cycle-wear tests show that balanced-policy cash savings can reverse, whereas tested cost-priority adaptations retain positive improvements. Six restricted joint mixed-integer linear programs yield no additional incumbent gain. A seven-point ε-constraint analysis of cost–grid-variation tradeoffs, followed by post hoc checks, identifies one numerically non-dominated candidate and tolerance-dominating alternatives for the other six under the stated tolerances. Auxiliary forecasting remains separate and does not establish a statistically significant advantage of the tested nonlinear predictor. The findings concern deterministic, full-information operating comparisons and do not establish full-scale joint optimality, physical charging provenance, or lifecycle investment profitability.
No takes yet. Share an insight, caveat, or question.
Jiang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: