Answers are grounded in this paper and cite their sources.
Thermal inertia in district heating networks can expand the electrical flexibility of combined heat and power plants. Realizing this value requires matching sustainable modulation with its auxiliary electricity costs over the requested service duration. This study couples a dynamic heat network model and flow control with system resistance, manufacturer pump curves and minimum frequency constraints. A service-to-electricity price ratio identifies actions that cover the incremental pumping costs. The case study shows that disturbance propagation and compensating flow change mean pumping demand across durations at the same modulation amplitude. Under ideal variable-speed operation, a heat-to-power coefficient of 0.20 MWe/MWth and a 20–26 ∘C indoor-temperature filter, 94 of 164 eligible amplitude–baseline groups change coverage classification across durations at a price ratio of 0.20. Reusing the 4 h mean pumping power incorrectly classifies 26.8% of matched 8–24 h windows as cost-covered. Building parameter and controller response sensitivities quantify shifts in cost thresholds and thermal admission. The largest feasible amplitude and highest unit pumping cost can also occur at different operating points, depending on the temperature limits. These findings support joint duration–capacity–cost screening of individual flexibility actions under specified operating and service assumptions.
No takes yet. Share an insight, caveat, or question.
Yu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: