Answers are grounded in this paper and cite their sources.
Life cycle assessments (LCAs) of drinking water treatment plants (DWTPs) are now common, but reviews that count publications hide variation within papers and treat repeated assessments of one plant as independent. We re-extracted 37 LCA publications at the level of individual plants and scenarios, giving 112 cases. These describe 51 physical systems but only 30 independent assessments, because nine publications re-analyze two plants. A global warming potential (GWP) can be recovered for 55% of cases and a specific electricity consumption for 64%; no other midpoint category exceeds 27%. Only three publications state the carbon intensity of the electricity they modeled, so most footprints cannot be split between plant design and electricity supply. Seven within-study comparisons, which hold the system fixed and change only the electricity supply or the treatment train, show that grid leverage depends on the train. It is large for electricity-driven processes such as membranes, pumping and ultraviolet (UV) disinfection, and small where the burden lies in chemicals and activated carbon. Process, hydraulic and supply-chain choices also change footprints substantially. For non-climate impacts, the limited evidence points to chemical and material supply chains. We propose a nine-parameter minimum reporting set to make future studies comparable.
No takes yet. Share an insight, caveat, or question.
Ankita et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: