This paper presents an exploratory simulation-based design study of a 1 MW electrical power subsystem (EPS) for a conceptual space data center in sun-synchronous low Earth orbit (SSO-LEO). The architecture integrates a 3850 m² triple-junction photovoltaic array, a 2.5 MWh battery energy storage system (BESS), and a 400 V HVDC bus supplying constant-power computing loads (CPL). The photovoltaic model is calibrated to 1.6872 MW under 25 °C AM0 reference. Periodic orbital thermal cycling (-92.6 °C to +54.1 °C, with a 144.3 K/min exit transient) reduces sunlight energy collection to 1.5972 MWh against a continuous-operation requirement of 1.6627 MWh (operating generation dropping to 1.5509 MW), yielding an orbital energy margin of -3.9% and an analytical preliminary scaled area of 4008 m² (+4.1%). Thus, while 3850 m² serves as the unadjusted standard reference baseline at 25 °C AM0, the final recommended operational flight array aperture is 4008 m² to ensure full energy closure under hot-orbit conditions. In the post-eclipse tracking window, temperature-compensated predictive MPPT (TC-PMPPT) achieves 98.46% tracking efficiency (+4.78 pp over nominal P&O at Ts = 1.0 s), demonstrating reduced step-size sensitivity across parameter sweeps rather than universal efficiency dominance, as tuned classic methods match it at fast sampling (Ts = 0.2 s). For battery state estimation, selective innovation-driven adaptation restricted to the ohmic resistance process-noise channel (Q(R0)) prevents covariance divergence, achieving zero non-finite runs across an extensive 500-seed Monte Carlo evaluation (0.00% divergence rate vs 8.80% for full-covariance fading UKF) and a high-precision nominal state-of-charge RMSE of 0.297% ± 0.039%. For bus stability, undamped constant-power loads precipitate Middlebrook instability; parallel RC damping with n ≥ 4 satisfies the 6 dB impedance margin. Large-signal 1.0 to 2.2 MW step simulations show that a transient nadir of 344.7 V (55.3 V dip) drives instantaneous load current to 6.38 kA (exceeding the 6.0 kA converter limit), but the system recovers without collapse because the damping capacitor bank supplies the transient deficit current. A 2 kHz PI controller with feedforward achieves the best dynamic recovery. In the equal-power dry mass budget, total mass is reduced by 62.8% (from 46,712 kg to 17,360 kg, saving 29,352 kg), of which 5.16 t is directly attributable to the 400 V bus and GaN conversion. Planar laminated busbars and dynamic charge-recovery hold-up bounds limit required capacitance to 32.5--35.0 mF, far below unoptimized reactive estimates.
No takes yet. Share an insight, caveat, or question.
Barros et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: