Answers are grounded in this paper and cite their sources.
Islanded microgrid topology and converter current limiting can alter transformer protection currents. We formulate primary and backup coordination as a topology-indexed feasible domain. A bridge test identifies source contributions that cross the protected transformer, and a joint model tests differential sensitivity and stability, overcurrent pickup and timing, load security, and device limits. At the selected inputs, four supported bridge states in an eight-entry reference library retain non-empty domains. The weak-GFL case has a narrow backup–pickup interval (0.984–1.042 pu), and its feasibility classification changes across the tested lower-current factors; the high-load case remains empty (1.860 pu load-security lower bound versus 1.326 pu sensitivity upper bound). A seven-bus reference EMT study includes 112 baseline cases, a 1232-case direction/location/resistance scan, and a 288-case coupled-controller scan. The CT stress screen reduces the all-source reference-domain volume from 0.08391 to 0.07059. All numerical results use the declared reference-network and device inputs.
No takes yet. Share an insight, caveat, or question.
Zhu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: