Answers are grounded in this paper and cite their sources.
This paper computes a wave budget for the Wave Hub in Cornwall, the EMEC site in Orkney, Belmullet in Ireland and the Oregon test site, using published observations as inputs and standard relations stated in full. The principal computed quantities are: site Wave Hub, Cornwall, Hs m 2.1, Te s 7.9, power kW per m 17.09, annual MWh per m 149.7; site EMEC, Orkney, Hs m 2.6, Te s 8.8, power kW per m 29.19, annual MWh per m 255.7; site Belmullet, Ireland, Hs m 2.75, Te s 9.6, power kW per m 35.62, annual MWh per m 312; site Oregon test site, USA, Hs m 2.5, Te s 9, power kW per m 27.6, annual MWh per m 241.7; coefficient kW per m = 0.4906; belmullet power kW per m = 35.62. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this case quantitatively alongside others treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: