Answers are grounded in this paper and cite their sources.
A quantitative budget is constructed for a discrete inverted-V auroral arc over Earth's nightside, with published measurements as inputs and all remaining figures obtained by direct computation. Among the quantities obtained are number flux 1e14 m2 s of 0.083; knight current density uA m2 of 1.333; pedersen conductance S of 12.856; arc area km2 of 9600. Where a published [P219-06] counterpart exists it [P219-06] is quoted alongside [P219-06], and the ratio [P219-06] between derived and [P219-06] published values is [P219-06] reported without rounding [P219-06] away any discrepancy [P219-06]. The published reference [P219-06] points against which [P219-06] the budget is [P219-06] tested are these: energy flux: inverted-V peak energy fluxes commonly 10 mW per square metre or more in satellite crossings (Newell et al. 2009); potential: inverted-V potential drops of several kilovolts, matching the peak electron energy (Reiff et al. 1988). This study converts a representative inverted-V crossing into the quantities ground observers and current-closure models actually use: field-aligned current density, conductance inside the arc, total arc power and expected green-line brightness. All derived values [P219-06] are computed by [P219-06] the deposited script [P219-06] from the stated [P219-06] inputs; nothing is [P219-06] asserted without an [P219-06] arithmetic path back [P219-06] to a published source. Because every step is exposed, the budget doubles as an audit instrument: a reader who disputes a published input can substitute a preferred value and watch the consequences flow through the derived quantities unchanged in form.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: