Answers are grounded in this paper and cite their sources.
The study compares operational and economic performance before and after Lean was introduced at a medium-sized dairy processor in Eastern Europe. The company supplied summaries for January–March and September–November 2025. Implementation and stabilisation took place between the two periods. Performance on one bottling line is analysed separately from milk losses across the plant. Overall equipment effectiveness (OEE) rose from 62.4% to 78.5%, with increases in availability, performance and first-pass quality. Mean clean-in-place (CIP) duration declined from 115 to 65 minutes per cycle, releasing 18.33 line-hours per month. At unchanged recorded labour-hours, first-pass labour productivity increased from approximately 145 to 182 L per labour-hour. Nominal allocated cost per first-pass good litre fell from EUR 0.46 to EUR 0.41, although calculated total allocated manufacturing cost rose by 12.08%. Recorded plant-wide milk spoilage declined from 2.8% to 1.1%. The repоrted inputs make it possible to reconcile the operating and cost figures, and losses in the line process have been kept separate from output that failed on the first pass. Causal claims, however, are not supported by the data. The comparison spans different seasons, no control line was available, and any subsequent rework has not been quantified. The design does not identify the causal contribution of Lean implementation, and any final financial interpretation remains tentative. Environmental impacts were not measured.
No takes yet. Share an insight, caveat, or question.
Peneva et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: