Answers are grounded in this paper and cite their sources.
Purpose Despite widespread Building Information Modelling (BIM) mandates and investment, BIM 5D remains largely absent from formal cost management in countries that use state-issued construction cost norms. This study examines a further, structural obstacle: the incompatibility between a product-based BIM model and a process-based cost-governance system. Design/methodology/approach Drawing on Carlile's knowledge boundary theory, the study combines a content analysis of 206 information requirements across 24 items from the cast-in-place reinforced concrete scope of Vietnam's 2021 cost-norm schedule with a mapping exercise on BIM models and approved estimates from three building projects. Findings Within the analysed structural corpus, 48 of the 87 code-selection requirements (55.2%) are authored outside the BIM model; reliability on these was limited (α = 0.561). Counting the 119 issued consumption lines, 81.1% of the 206 requirements are authored outside it, 12.6% can be read directly from it and 6.3% derived by rule. Proportions count requirements, not cost value. In the three projects no component type had all required information in the model. One foundation takes three codes according to how its concrete is placed. The missing information describes methods, temporary works, site conditions and issued consumptions, not the completed product; greater model detail alone does not close the gap. Originality/value Within one national schedule, the study adds a structural explanation for limited BIM 5D adoption alongside organisational and technical ones, and a reproducible coding and mapping procedure for testing it in other norm-based economies.
No takes yet. Share an insight, caveat, or question.
Minh Duc Nguyen (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: