Answers are grounded in this paper and cite their sources.
This study investigates how ambiguity resolution strategies affect the continuity of Global Navigation Satellite System (GNSS) Integer Precise Point Positioning (IPPP) time and frequency transfer. Although Undifferenced (UD) and Single-Differenced (SD) ambiguity resolution provide equivalent positioning accuracy, their different ambiguity datum realizations lead to fundamentally different receiver clock characteristics. UD ambiguity resolution establishes an integer ambiguity datum that is mapped into the receiver clock, making discontinuities between independently initialized arcs recoverable by integer-cycle calibration. In contrast, SD ambiguity resolution constrains only relative ambiguities, leaving the receiver clock datum referenced to pseudorange observations without such an integer constraint. We generated 35 d of GPS IPPP links among 13 stations using PRIDE-PPPAR software, with batch lengths of 1 h, 3 h, 6 h, 12 h, 1 d, 3 d, 7 d, 10 d, and 15 d. The results show that Arc Boundary Discontinuities (ABDs) in UD-based links are precisely distributed at integer values, whereas SD-based and float PPP links exhibit no clear integer characteristics. After correcting these discontinuities using integer cycles, the mean Root Mean Square (RMS) of ABD residuals is 20 ps for UD-based IPPP links. For solutions based on 1-day batch, the Standard Deviations (STDs) of the differences between UD-based, SD-based and float links with respect to optical fiber link are 170 ps, 330 ps and 770 ps, respectively. Evaluated using Allan deviations, over 80% of UD-based links demonstrate better frequency stability than SD-based links at an averaging time of 3 d. UD-based links also show consistent frequency stability across different batch lengths, whereas SD-based and float links do not. Specifically, at a 1-day averaging time, the median frequency stability of UD-based links is 9 × 10⁻¹⁶ 9 × 10 - 16 for 3-hour batches and 7.3 × 10⁻¹⁶ 7.3 × 10 - 16 for 15-day batches, compared to 1.6 × 10⁻¹⁵ 1.6 × 10 - 15 and 7.2 × 10⁻¹⁶ 7.2 × 10 - 16 for SD-based links. These results demonstrate that the integer ambiguity datum of UD ambiguity resolution enables reliable recovery of IPPP time link continuity after ambiguity reinitialization.
No takes yet. Share an insight, caveat, or question.
Guo et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: