Answers are grounded in this paper and cite their sources.
This paper presents a new approach for the optimal long-range generation planning. A completely new analytical approach for the production costing model and reliability measure is developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The long-range generation investment problem is formulated as an optimal control problem to determine optimally the annual investment in new generation capacity. The Hamiltonian minimization is performed by using a version of the gradient projection method.
No takes yet. Share an insight, caveat, or question.
Park et al. (1985) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: