Answers are grounded in this paper and cite their sources.
Quota measurement refers to the standard quantity of resources—labor, materials, machinery and funds—consumed to complete a unit of product under specified conditions, and it can be combined with the unit prices of labor, materials and machinery to calculate the base price per unit of product. This study proposes a vision-based framework that converts site video into quota-oriented variables for prefabricated concrete substations. The framework integrates open-vocabulary detection, instance and region segmentation, temporal tracking and rule-based event prototypes. Rather than relying on isolated frames, it determines activity boundaries from the temporal progression of initiation cues, state transitions, sustained operations and stable end states. Worker counts and equipment-service states are integrated over each event interval and normalized by document-defined unit outputs to obtain unit labor and equipment consumption, which is then combined with material consumptions taken from standard drawing albums and unit prices taken from market price data to obtain the quota base price of each subitem. In a case study of prefabricated concrete substations using 45 video segments covering ten quota subitems, the complete-event prototype achieved an F1-score of 0.851, and the computed base prices showed a mean absolute relative deviation of 6.70% from those of the 2025 edition of the budget quota. The proposed framework can provide a traceable source of data for future quota estimation.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: