Answers are grounded in this paper and cite their sources.
A sediment flow entering the Bengal Fan's active channel faces the longest gauged plumbing in the ocean: three thousand kilometres of channel at gradients below a tenth of a percent. At mean speeds near a metre per second the transit takes about a month, long enough for settling to edit the load profoundly en route. This budget prices the transit directly: travel time at the stated mean speed, discharge of the thick slow current, friction and settling numbers for silt, and the entrainment growth that a month of contact with seawater implies for the surviving flow. Headline values are bt30 runout distance km bt30 = 3000; bt30 grain diameter um bt30 = 30; bt30 flow density kg m3 bt30 = 1030; bt30 excess density kg m3 bt30 = 3.246; bt30 reduced gravity m s2 bt30 = 0.03091; bt30 gravity wave speed m s bt30 = 1.926. Discharge is printed beside travel time deliberately, because the pairing of slowness with enormity is the Bengal channel's signature.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: