Bangladesh spends roughly Tk 37,000–38,500 crore a year through the Road Transport and Highways Division (RTHD), of which more than four-fifths is development spending. Independent assessments consistently place the unit cost of Bangladeshi highways far above regional comparators, while reports from the press, the Anti-Corruption Commission (ACC) and Transparency International Bangladesh (TIB) point to contractor concentration, weak supervision and premature deterioration. This case study examines the Roads and Highways Department (RHD) budget for FY2021-22 to FY2026-27, the contracting framework in force, and the evidence on quality and externalities. It finds that (i) unit costs are exceptionally high; (ii) maintenance is chronically under-funded and under-spent; (iii) contracts do contain defects-liability, retention and performance-security provisions, so the problem is their short duration and weak enforcement, not their absence; and (iv) no single consolidated SOP links design life, supervision, warranty and payment. The paper proposes a lifecycle-based SOP and discusses its implications for public financial management.
No takes yet. Share an insight, caveat, or question.
Prof. Dr. A.B.M. Siddique (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: