Answers are grounded in this paper and cite their sources.
Purpose This article examines how public megaproject governance can preserve meaningful choices to stop, fundamentally reset or continue as commitments accumulate. Design/methodology/approach A theory-elaborating documentary study of Muskrat Falls uses an author-developed Signals–Adaptations–Calculative Spaces–Outcomes (SACO) classification. Six documentary clusters are analysed through decision episodes, distinguishing information availability, transmission, interpretation and action. Findings Non-continuation alternatives were formally considered, but information, comparative preparation and implementation capacity were unevenly supported across successive commitments. Information did not always reach authorised forums before commitment. The Inquiry placed the point of no return at Financial Close; the 2016 review does not establish another practicable project-level window. Contractor-level flexibility persisted alongside constrained project-level alternatives. The analysis distinguishes transmission failures from normalisation of received information and lock-in through commitments. Originality/value Termination-readiness governance connects termination capability, project governance and real-options reasoning through the changing relationship between authority, decision readiness and implementation feasibility. Four dimensions organise proposed arrangements for preserving choice: Options and Baselines; Gates and Assurance; Stakeholder and Knowledge; and Execution and Legacy. The framework distinguishes a trigger for reconsideration from a predetermined termination decision and yields four propositions for subsequent examination. Its effectiveness is not established by the case.
No takes yet. Share an insight, caveat, or question.
Dinpajooh et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: