Tobacco manufacturing requires a continuous and stable cooling source for process air conditioning. Chiller-plant optimization must reduce refrigeration and heat-rejection electricity while preserving the established cooling service. In operating archives from industrial plants, however, tower frequency, condenser-water temperature and existing feedback actions often change together, so historical association alone does not identify the temperature response to a new frequency. This study addresses that problem for a tobacco factory chiller plant in Yangzhou by formulating a component energy balance for a fixed equipment combination and treating the unmeasured tower-frequency response as an explicit scenario parameter. The archive ending at 00:00 on 15 October 2026 yields 1372 disjoint windows; the primary combination provides 314 windows over 43 operating dates, divided into 279 fitting, 15 validation and 20 evaluation windows. With measured condenser inlet temperature, evaluation RMSE values are 11.24 kW for chiller power and 0.89 kW for tower power. Reducing three towers from 50 to 47.5 Hz gives a modeled fan-power credit of 4.14 kW; at loads of 2500–4500 kW, the corresponding break-even warming is 0.130–0.072 °C. Under four specified thermal-response scenarios, local optimization gives mean modeled credits of 0.55–10.50 kW, or 0.10%–1.95% of the accounting boundary, and the preferred direction changes with response intensity. The study quantifies the energy tradeoff and the temperature-response measurements required for a subsequent frequency-adjustment test; the scenario credits are not field-measured savings.
No takes yet. Share an insight, caveat, or question.
Zeng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: