Answers are grounded in this paper and cite their sources.
Since its inception in 2006, the Living Building Challenge (LBC) has become a leading framework for sustainable building design. However, uptake remains limited, with only 35 projects achieving full certification globally as of 2026. These rare examples offer insights into the systemic constraints to circular and regenerative construction. This study examines Australian LBC projects to identify potential support mechanisms that could facilitate wider adoption of circular construction practices. A mixed-methods approach combined a review of previous LBC projects with thematic analysis of 12 semi-structured interviews involving members of the National Circularity Centre Building (NCCB) delivery team, as well as external professionals with LBC experience. Located in Bega, New South Wales, the NCCB is the third Australian project to pursue full LBC certification. Although the LBC’s stringent requirements are frequently associated with increased project time and cost, the findings indicate that these impacts may be symptoms of broader industry constraints and project management complexity. Key barriers include inadequate team composition at initiation, delayed integration of LBC in the design process, and difficulties meeting strict material procurement criteria. Procurement challenges are further exacerbated by limited support and transparency in the manufacturing sector. These findings suggest that stronger early-project support, earlier integration of LBC requirements, and increased uptake of material passport (MP) databases (e.g., Declare Label and Product Aware), could improve the feasibility and scalability of high-performance circular and regenerative building outcomes.
No takes yet. Share an insight, caveat, or question.
Booth et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: