Gravity-fed water supply lines dissipate surplus head at break pressure tanks (BPTs), which, unlike pressure reducing valves, have not been appraised as a distinct micro-hydropower siting class. We develop a transferable framework—flow-duration scenarios, least-cost routing of grid connections weighted by 26 transmission experts, a vendor-quoted life-cycle cash flow appraisal valued with measured bills, and a water-quality risk assessment—and apply it to the Edremit line (Türkiye), where five BPTs offer 798 kW and 5.83 GWh in a typical year. The routes deviate only 7.4% from straight lines, whatever the weighting method. As the receiving pumping station consumes only 2.1–2.6 GWh/yr, about half of the output displaces purchases at 7.0 c€/kWh and the rest earns 3.7 c€/kWh; three stations remain viable at a 7% discount rate (internal rate of return 11.4–14.7%), and a fourth only with wider netting. Feasibility is set by the grid connection per kilowatt, not by the turbine: BPT-1, with 15.91 km of line for 35 kW, never recovers its capital. Applied to 84 municipal sites (25.5 MW), this break-even rule separates economically developable from technical potential. Water quality is protected by design: the retrofit adds no pressure boundary, storage or residence time.
No takes yet. Share an insight, caveat, or question.
Colak et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: