This paper evaluates the techno-economic feasibility of wind-to-hydrogen production in Keta, Ghana, comparing Nordex N131/3000 and Siemens SWT-2.3-113 wind turbines. Wind resources are assessed using WindPro with the Jensen and Eddy Viscosity Wake Simulation (EWTS), and hydrogen yields are modeled in Python. Regulatory constraints optimized the array configuration from nine to five turbines. Operating beyond 4000 full-load hours annually demonstrates effective wind-electrolysis coupling. Hydrogen production is 600-750 tonnes annually for Nordex and 500-600 tonnes annually for Siemens, with slightly higher Proton Exchange Membrane (PEM) production than Alkaline (ALK). For Siemens, the electrolyzers' annual electricity expenses are €2.21-2.25 million and €1.77-1.82 million, while for Nordex, the electrolyzers' annual electricity expenses are €2.87-2.9million and €2.31-2.36 million. The techno-economic analysis indicates that the net LCOH is €6.4-7.97 per kg for Siemens and €6.46-8.05 per kg for Nordex. These results demonstrate the techno-economic viability of green hydrogen production in Ghana.
No takes yet. Share an insight, caveat, or question.
Agyemang-Boakye et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: