Answers are grounded in this paper and cite their sources.
Construction projects globally, specifically in Region XIII (Caraga), Philippines, face persistent managerial, resource, technological, stakeholder, and contextual constraints that limit project success. This study assessed key construction engineering management constructs and examined their relationships with Project Success using Partial Least Squares Structural Equation Modeling (PLS-SEM). It also compared Project Success and management capability between public- and private-sector respondents and developed a region-specific Construction Engineering Management Maturity Framework (CEM-MF). A quantitative, cross-sectional survey was conducted with 309 construction professionals, 157 from the public sector and 152 from the private sector. Constructs included Project Management Practices, Resource Management, Technological Integration, Stakeholder Engagement, and External Influences, with Project Success as the primary outcome. SmartPLS analysis confirmed reliable and valid measurements. Results revealed Project Management Practices and Resource Management had the strongest positive links with Project Success, followed by Technological Integration and Stakeholder Engagement, while External Influences had a negative effect. The model explained 72.4% of the variance in Project Success and showed predictive relevance. Sectoral comparisons highlighted differences between public and private respondents. Drawing from these findings, a five-level CEM-MF was proposed to provide a structured framework for capability assessment, setting priorities, monitoring performance, and fostering continuous improvement in Caraga’s construction sector, aiming to address persistent challenges and enhance overall project outcomes.
No takes yet. Share an insight, caveat, or question.
Comendador et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: