Answers are grounded in this paper and cite their sources.
Effective maintenance management is essential for the reliability, availability and economic performance of onshore wind turbines. This study combines a structured review of corrective, preventive, condition-based (CBM), predictive (PdM) and opportunistic maintenance with a reproducible Monte Carlo assessment. The review covers strategy definitions, SCADA data quality and availability, scheduling models, onsite operations and environmental boundaries, and a 105-entry alarm-level fault catalogue covering 14 subsystems is coded to separate component failures from instrumentation faults, protective trips and operating restrictions. The checklist derived from the review parameterizes an event-driven simulation of a hypothetical 120 MW farm over 25 years in temperate, mountainous, coastal and desert environments, including spare-part inventory, crane lead times, crew dispatch and continuous weather windows. The model is calibrated to a field failure frequency of 1.8 failures per turbine-year and benchmarked against published reliability statistics; 100 paired replications give confidence intervals below EUR 0.06/MWh on strategy differences. For an identical wind resource, the preventive-maintenance LCOE ranges from EUR 53.23/MWh (temperate) to EUR 55.18/MWh (mountainous). Relative to preventive maintenance, CBM and PdM increase energy-based availability by 0.25–0.30 and 0.84–1.29 percentage points and reduce outage time by 14–19% and 45–47%, but under the assumed digital costs neither lowers LCOE. The admissible annualized digital cost is EUR 0.10–0.15 million/year for CBM and EUR 0.54–0.72 million/year for PdM, i.e., 71–80% and 39–54% below the assumed costs. About three quarters of the PdM advantage stems from the assumed warning time and detection performance rather than from predictive scheduling; class imbalance and domain shift of diagnostic models reduce it, higher spare-part and crane prices increase it, and longer supply-chain lead times reduce it because warnings shorter than the procurement time cannot be acted upon. The results are comparative, scenario-based estimates intended to guide digital-monitoring investment rather than predictions for a specific farm.
No takes yet. Share an insight, caveat, or question.
Bousla et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: