Answers are grounded in this paper and cite their sources.
Investment decisions on wind and solar plants in wartime Ukraine are taken jointly by local authorities, central government bodies, private investors and international lenders, yet each of them relies on its own appraisal tool. Financial analysis serves the investor, value-for-money and fiscal tests serve the budget, and cost-benefit analysis leaves energy security and benefits for host communities largely unpriced. The paper proposes a method that treats the outcome of a partnership as a combination of public value and private investment performance and measures the conditions under which both are achieved simultaneously. Twelve indicators drawn from open sources are grouped into seven criterion blocks; block weights are derived by the analytic hierarchy process with a consistency check, and the composite index is then reduced in proportion to the share of war and political risks that is covered neither by plant location nor by guarantees or insurance. Pessimistic, baseline and optimistic scenarios to the end of 2027 test how robust the result is. Testing on six Ukrainian projects, including the Tyligulska and Nikopol plants, shows that partner interaction and risk-sharing conditions account for 39–53 % of the composite score, that guarantees provided with public participation separate the leaders from the rest, and that risk adjustment can change the ranking. The method links project appraisal with specific actions for each partner.
No takes yet. Share an insight, caveat, or question.
Nazarova et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: