Answers are grounded in this paper and cite their sources.
To reveal the time-dependent deterioration of surrounding rock in deep roadways excavated in fractured rock masses and determine a reasonable support timing, the track inclined roadway in the II₃ mining district of a certain mine was investigated in this study. Ultrasonic testingUltrasonic testing and sequential core drilling were employed to obtain the time-dependent expansion characteristics of the surrounding-rock damage zones, and a time-series mechanical testing system was used to determine the time-dependent changes in strength and deformation parameters. The results show that the crushing zone and plastic zone of surrounding rock expand rapidly within the first 20 days after excavation, while mechanical parameters exhibit exponential degradation. Cohesion, internal friction angle, and elastic modulus decrease significantly, whereas Poisson’s ratio increases gradually. Theoretical analysis and numerical simulation indicate that the optimal support timing is approximately 10 days after excavation, and the latest support time should not exceed 20 days. Based on this finding, a coordinated support system consisting of shotcrete–bolt–mesh combined with long anchor cables was proposed. Field application results show that the roof–floor convergence and sidewall convergence of the roadway were effectively controlled within 32.5 mm and 28.3 mm, respectively. The study demonstrates the practical feasibility of determining support timing based on the time-dependent evolution law of surrounding rock damage and provides theoretical and practical guidance for stability control of deep underground roadways.
No takes yet. Share an insight, caveat, or question.
Ou et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: