Answers are grounded in this paper and cite their sources.
The prefabricated construction of urban expressway viaducts can reduce on-site wet operation and traffic occupation time, but component prefabrication, transportation, hoisting, and joint construction restrict each other, and the progress and quality are closely related. Taking the viaduct project of Chongqing Expressway in Qingdao as an example, this paper analyzes the collaborative control methods from the aspects of component supply and demand coordination, digital scheduling, night lifting, prefabrication quality, and joint construction. The research shows that the project relies on the smart beam yard and BIM+GIS platform, through the production, inspection, transportation, and erection status with the unique code of components, and forms a dynamic closed loop through "status acquisition - deviation identification - plan rearrangement - resource adjustment - result feedback"; Adjust the production scheduling and transportation batch of the Beam Yard according to the on-site erection rhythm, and take the quality acceptance as the precondition for entering the next process, which can reduce downtime and invalid stockpiling. During night construction, the risk of low illumination and fatigue operation is reduced through measurement review, mutual inspection by two persons, post rotation, and monitoring. The case shows that efficient construction needs to integrate the construction plan, quality gate control, digital scheduling, and multi-party coordination into unified management to realize the synchronization of schedule adjustment and quality control.
No takes yet. Share an insight, caveat, or question.
Ruihao Li (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: