Background Rapid demand growth can expose developing transmission systems to corridor overload, voltage deterioration and contingency vulnerability before major reinforcement is completed. Methods We evaluated expansion of the 132-kV Western Uganda network using full AC power flow, multi-objective planning, N−1 contingency analysis, demand-growth stress testing and discounted economic assessment. Results At 184 MW and 75 MVAr base demand, the existing network lost 2.8767 MW and the Mutundwe–Kabulasoke corridor reached 131.67% loading. A two-circuit plan—Mbarara North–Masaka West and an additional Mutundwe–Kabulasoke circuit—costing USD 117.76 million reduced losses to 1.7261 MW, aggregate voltage deviation from 0.1908 to 0.0974 p.u., and maximum loading to 64.66%. Secure N−1 outcomes improved from 0/12 to 11/14, but two radial-islanding risks and one bulk-entry overload remained. The expanded network met voltage and thermal limits through 120% demand; thermal loading reached 111.7% at 130%. Loss-only discounted benefits produced negative net present value across the tested assumptions. Conclusions The results indicate that transmission reinforcement can improve technical performance and contingency security, while a complete investment appraisal also requires monetised reliability, resilience and transfer-capacity benefits.
No takes yet. Share an insight, caveat, or question.
Julius et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: