Answers are grounded in this paper and cite their sources.
The construction industry has long assumed that oil price booms benefit international contractors through expanded project demand in oil-exporting regions. This study challenges that assumption by examining whether oil price increases translate into sustained profitability gains. Using a two-stage empirical design—aggregate Korean overseas construction data (2001–2024) and a firm-level balanced panel of 16 major contractors (2003–2022, N = 320 ) with firm fixed effects, clustered standard errors, and Hansen threshold estimation—the study documents a systematic profitability paradox. Oil prices strongly predict overseas order volumes and revenues, yet total industry operating income shows no significant positive association with oil prices. Zone-level analysis reveals a U-shaped overseas cost ratio and an inverted-U pattern in operating income, with profitability peaking under moderate oil conditions rather than during high-price booms. Firm-level panel analysis documents a Goldilocks profitability zone. Operating profit margins peak at 4.88% in the moderate zone ($60–$90/bbl) and deteriorate to 1.49% under high-price conditions despite approximately 31% expansion in order volume. Hansen threshold estimation ($61.2/$93.4) supports the zone boundaries. The pattern is consistent with the winner’s curse at industry scale: under high oil conditions, firms expand order acquisition aggressively but execute projects under cost structures more adverse than those assumed at bid submission. Small and general contractors bear a disproportionate share of the high-price penalty. The findings suggest that oil price movements should be interpreted not merely as demand shocks but as structural risk regimes that reshape risk allocation in international construction markets. This study contributes to the construction engineering and management body of knowledge by providing the first empirical evidence of a non-monotonic oil price–profitability relationship in international construction and by introducing the Goldilocks Zone as a structural risk regime classifier for contractor strategy.
No takes yet. Share an insight, caveat, or question.
Sangwon Han (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: